R&D tax credits for aviation & aerospace.
Home to global carriers and a growing aerospace base, the UAE is engineering aircraft systems, maintenance and manufacturing at world scale. Some of that work resolves real technical uncertainty. The discipline is proving precisely which part qualifies.
How qualifying R&D shows up in aerospace.
The UAE regime tests every project against five conditions in Ministerial Decision No. 24 of 2026, Article 3(1), assessed with regard to the OECD Frascati Manual. Here is what each looks like in an aircraft system, an MRO process, or a manufacturing line.
Novel
Systems or processes aimed at capability existing aerospace practice lack
Creative
Original engineering and methods, not routine application of standards
Uncertain
Whether the design, repair or process performs to requirement is unknown.
Systematic
Planned analysis, test and certification-grade validation
Transferable
Results reproducible across aircraft, fleets or production runs.
The kind of work that qualifies.
Illustrative projects across aircraft systems, MRO engineering and aerospace manufacturing. Eligibility is always confirmed project by project.
Aircraft systems
Avionics, propulsion or control developments where performance or integration is genuinely uncertain.
MRO & repair engineering
Novel repair or overhaul methods for damage or components with no established procedure.
Aerospace manufacturing
Composite or metal processes meeting tolerances and certification no current method reaches.
Sustainable aviation
SAF handling, electrification or efficiency work with uncertain technical outcomes.
Predictive maintenance
Predictive-maintenance models requiring new modelling on real fleet data.
Advanced materials & coatings
Materials or coatings engineered for aerospace loads and Gulf operating conditions.
Genuine R&D, not routine engineering.
The value we add is drawing this line correctly claiming what qualifies, and defending it, while leaving out what does not.
- Resolving technical uncertainty in a system, repair method or process.
- Systematic test and certification-grade validation of an uncertain design.
- Novel manufacturing or repair methods with no established procedure.
- Engineering performance or durability beyond current capability.
- Routine maintenance and overhaul to an established procedure.
- Manufacturing to a proven, qualified process without uncertainty.
- Applying published standards where the outcome is known.
- Fleet or commercial planning with no technical development.
AED 396M+
ICAEW Chartered Accountants, AED 396M+ (£80M+) in R&D incentives secured in the UK 1,300+ R&D claims processed (UK practice) – including aircraft systems, materials testing and maintenance engineering. The same chartered method now applies to the UAE.
“RDvault is a user-friendly solution that saved us countless hours on documentation and compliance.”
Voltaware – RDvault client
We are preparing UAE pre-approval submissions through TAWWER now. UAE outcomes will be published here as claims complete, subject to client consent.
Most MRO is routine. Can any of it qualify?
Routine overhaul to an approved procedure does not. But developing a new repair method – for damage or a component with no established procedure, where success is uncertain – can be strongly qualifying.
Aerospace is heavily certified. Does certification work count?
Certification paperwork itself is not R&D. But engineering a design to meet a certification bar that demanded genuine, uncertain technical development can form part of a qualifying project.
We manufacture to a customer's design. Does that qualify?
Manufacturing to a proven process does not. But where achieving the required tolerances or performance requires developing a new process with an uncertain outcome, that development can qualify.
What evidence will we need?
Contemporaneous records: the technical uncertainty, the analysis and testing done to resolve it, and project-level cost and staff-time allocation. We build this as the work happens – and Council pre-approval through the TAWWER platform is mandatory before claiming. Applications are submitted via TAWWER, accessed with UAE PASS and authorised by the signatory registered with the Federal Tax Authority. As at 27 October 2026, calendar-year 2026 companies must apply within 40 business days of 31 December 2026, which is 26 February 2027. Work already under way can be included if it was recorded as it happened.
Working in aerospace? Let’s find what qualifies.
We assess your projects against the five criteria, prepare and file your TAWWER pre-approval submission with the Council, and build the evidence before a single figure is claimed.